« Home | In the Snow » | Things that go bump » | Tilt Shift Mimicking » | Kid Profiles 2009 » | Santa Pic 08 » | Drake's 3rd Birthday » | The Perfect Evening » | Guess The Color? » | Future Gamer » | Time for a Change » 

Wednesday, February 18, 2009 

Master Bedroom Remodel

So I've been listening to a lot of John Tesh radio show lately as I spray and paint. I was too messy and a little high from the paint fumes to bother changing the channel!

Started a little over a week ago working evenings on it and would've been done sooner except for the difficulties that sprang up (always). These included a *painted* popcorn ceiling which takes longer than normal to remove, a rotten sill plate by the door (from a previous roof that leaked-which is likely also the reason for the painted ceiling) leading to a hole outside, etc. Still have a little trim painting to do (and eventually replace the windows) but this is mostly it.

So new ceiling, electrical outlets/switches, paint, and trim, and a thorough cleaning in places you never get to except between moves. 1 Bdr down, 2 to go.

Those on FB will need to "View Original Post" link below to see the slideshow.

Labels:

Beautiful!

It looks really good - que bueno

Great job!

Post a Comment